Manotick.co
Manotick / Services / Renovation Contractors / Bathroom Renovation

Bathroom renovation in Manotick

A Manotick bathroom is rarely the five-by-eight box that the online cost calculators assume. Estate ensuites here run to the size of a city bedroom, most of the postal code is on a well and a septic bed, and both of those facts move a quote more than the choice of tile does. This page gives the 2026 numbers by tier, the one decision that sets the budget, the septic rule that catches people out, and the three contractors we would call — starting with the one whose office is actually in the village. For kitchens, see the kitchen page; for basements and additions, renovation contractors.

A renovated bathroom with a walk-in tiled shower, frameless glass and a floating vanity
A mid-range walk-in shower and vanity, the $18,000–$35,000 tier below. AI-generated illustration

If they're booked

The next two calls — same standard, next in line for the top spot. No business has paid to be here, or anywhere on this site. Location and credential facts come from each business's own public sources; how we check them. Know a business that belongs here? Tell us.

27 Providence Pl, Nepean · Based in Nepean, not Manotick. Owner-run bathroom and kitchen renovator that publishes a Manotick bathroom page and a BBB profile.
Why we'd call them what Gordmay Construction says about itself

A Nepean renovation company run by its owners, Drew and Jan Halliday, that lists bathroom renovation first among its services and maintains a page specifically for Manotick bathroom work.

Drew and Jan Halliday (owners)

Does bathroom renovations · kitchen remodelling · tile work and flooring · structural repairs and wall removal · basement finishing · windows, doors, siding and decks

Publishes Better Business Bureau profile; HomeStars reviews

  • Names both owners on its own site — rarer than it should be in this trade
  • Publishes a Manotick-specific bathroom renovation page, so it is quoting here already
  • Carries the structural and drywall trades in house rather than subbing them

Read from the business's own site on 2026-09-20. Credentials are as stated by the business; check licence and insurance directly before you hire.

Ottawa (no street address published) · Ottawa-based interior renovator that names Manotick, Greely and Kemptville in its service area. Bathrooms, kitchens and basements; free estimates; Monday to Friday, 7 to 4.
Why we'd call them what Miles Contracting says about itself

An Ottawa interior renovation firm that describes itself as trusted by over 200 customers in the Ottawa area, sources materials locally and offers references from past clients on request.

Mon–Fri 7:00am–4:00pm · closed weekends

Does bathroom remodelling · kitchen renovation · basement finishing · feature walls · home offices and custom bars

  • States it is "trusted by over 200 customers in the Ottawa area"
  • Free estimates and references available on request
  • No street address, licence or warranty statement on its site — ask for all three when you call

Read from the business's own site on 2026-09-20. Credentials are as stated by the business; check licence and insurance directly before you hire.

Support Local · Manotick means the business operates from K4M — a storefront, yard, office, or a documented owner or mobile base here — not that it merely covers the area (how we test it). Independent means locally owned rather than a chain or franchise.

manotick.co is a directory, not a party to any work. Every button above goes straight to the business; any quote, contract, warranty or dispute is between you and them. Confirm licence and insurance and get it in writing before work starts — terms.

Greely too. Greely (K4P) is eight kilometres east along Mitch Owens Road and on the same wells and septic; most of the businesses on this page serve it as well as Manotick — say "Greely" when you call and confirm any travel charge. For the trades with a yard or office in Greely itself, see contractors based in Greely.

Who is the best bathroom renovator in Manotick?

Short answer: The only one of the three with premises in the village is C. Veh, which also draws its own permit-ready plans — the thing a bathroom that moves plumbing needs first. Gordmay is an owner-run Nepean firm already quoting Manotick bathrooms and carrying tile and structural work in house. Miles is the value call for a same-layout refit, with references on request. For an ensuite that changes the layout, start with C. Veh; for a straight gut-and-replace, get all three to price it.

BusinessBasedOwnershipWhat sets them apart
C. Veh Construction & Renovations Manotick (K4M) Independent The only bathroom renovator here whose own premises are in Manotick, and the owner is an architectural technologist — the layout-change drawings come from the same desk as the quote.
Gordmay Construction Nepean Independent Owner-run, names its owners, publishes a Manotick bathroom page and a BBB profile; tile, drywall and structural work done by its own crew.
Miles Contracting Ottawa Independent Weekday crew that names Manotick, Greely and Kemptville in its service area, quotes for free and offers past-client references — ask for licence and insurance, which its site does not state.

A comparison of the three businesses this site would call first, on facts each publishes about itself — not a ranking of every bathroom renovator working in K4M, and not a rating. "What sets them apart" is our opinion, formed from the criteria we publish. No business has paid for a place in this table, and payment would not change it. Confirm licence and insurance directly before you hire.

What a bathroom renovation costs in Manotick — 2026 rates

Typical bathroom renovation costs — Manotick planning estimatesPlanning estimates
Typical bathroom renovation costs in Manotick — planning estimates, Canadian dollars, before tax unless noted
Service or scopePlanning range
Powder room or cosmetic refresh (fixtures, vanity, paint, no layout change)$7,000 – $15,000
Full gut, same layout, mid-range finishes$18,000 – $35,000
Primary ensuite, high-end (large footprint, custom tile, glass, heated floor)$40,000 – $80,000+
Tub-to-shower conversion$4,500 – $11,000
Walk-in shower with frameless glass (installed)$3,000 – $10,000
Full retile — floor and shower walls$5,000 – $12,000
Heated floor, 50–80 sq ft (installed)$1,200 – $3,000
Moving a toilet, vanity or shower drain (each)$800 – $4,000
Cast-iron drain replacement (pre-1970 homes)$1,500 – $4,000
Basement bathroom addition (including ejector pump on a rural lot)$15,000 – $30,000
City of Ottawa building permit, small interior jobabout $160 – $200
Ranges reflect Ottawa-area 2026 pricing adjusted for the larger ensuite footprints and septic-adjacent plumbing common on K4M estate lots. Labour is 40–50 per cent of a mid-range budget; hold 10–15 per cent in reserve. Planning estimates — not yet confirmed with K4M-serving providers. These ranges are drafted from published figures and official sources and scoped to this area; they are for budgeting, not a quote. Get two or three written quotes before committing; if a table here is well off what you were quoted, tell us.

What a bathroom costs here, and why it is more than the Ottawa number

Three tiers cover almost every bathroom job in K4M. A refresh — new vanity, toilet, tub or shower surround, paint, nothing moves — runs $7,000 to $15,000 and is often a two-week job. A full gut with the same layout is the mid-range: everything to the studs, new tile, new fixtures, drains where they were, $18,000 to $35,000. A primary ensuite done properly — the ones in Rideau Forest and Manotick Estates that are the size of a city bedroom — runs $40,000 to $80,000 and up once you add a curbless shower, a freestanding tub, heated floor and custom glass. The reason Manotick quotes land above the Ottawa averages is not that the trades charge more; it is that the rooms are bigger and the plumbing is more involved. Tile is priced by the square foot and an estate ensuite has two or three times the tile of a 1970s five-by-eight. And on a well-and-septic lot, any drain that moves is a conversation about the septic bed, not just the subfloor.

The single decision that sets the budget

Whether the plumbing stays where it is. Keeping the toilet, vanity and shower on their existing drains is the line between the mid-range tier and the high one — moving a toilet drain in a slab-on-grade or a finished basement is $1,000 to $3,000 before anything visible happens, and moving a shower can be $4,000. On a home built before 1970, expect the contractor to find cast-iron drains and galvanized supply; replacing them while the walls are open is $1,500 to $4,000 and worth every dollar, because doing it later means opening the new tile. Ask every quote to state, in writing, whether the price assumes fixtures stay put.

Wells, softeners and the shower you are actually buying

Most of Manotick outside the village core and Mahogany is on a private well. Hard water and iron are the norm, and they decide how a new bathroom ages: a $1,500 rain head and a frameless glass enclosure look tired within a year if the water is untreated. If you do not already have a softener, price one into the renovation — see water treatment — and if you do, ask the plumber to confirm the bathroom is on the softened loop rather than a bypass. Pressure matters too: many well systems run 40–60 psi, which is fine for a standard valve and disappointing for a body-spray system; the fix is at the pressure tank, not in the bathroom, and it is a question for the well service before you buy fixtures.

Septic: when a bathroom becomes a septic question

Adding a bathroom, or adding fixtures to one, adds fixture units to a system that was sized for the house as built. The Ontario Building Code triggers a septic review when a renovation adds fixture units, adds a bedroom, or increases finished floor area by more than 15 per cent. In practice: a new powder room in a house whose bed was designed for three bedrooms and two baths may pass; a fourth bathroom on a 1980s bed usually needs the system assessed, and sometimes a larger bed. That review goes through the Ottawa Septic System Office at the RVCA, not the City, and a contractor who works out here will ask about it in the first phone call. If yours does not, that is useful information. Details on the septic page.

Permits and approvals

Replacing fixtures in place — a new vanity, toilet, tub or tile — needs no permit. A City of Ottawa building permit is required the moment you alter or extend plumbing, move or remove walls, or change a structural opening; the fee for a small interior job is a few hundred dollars and the schedule cost is two to six weeks. The rule that catches people out here is septic: adding fixture units, adding a bedroom, or growing finished floor area by more than 15 per cent triggers a review through the Ottawa Septic System Office, which the Rideau Valley Conservation Authority runs under Part 8 of the Ontario Building Code — not the City. A second full bathroom on a 1980s three-bedroom bed is exactly the kind of change that needs that call before the tile is ordered. Near the river, a Section 28 permit only applies if you are altering the site or shoreline, so an interior renovation does not trigger it.

Getting a straight quote

Three written quotes on the same scope is the only way to compare. Give each contractor the same sheet: fixtures stay or move, tile grade, glass or curtain, heated floor yes or no, who supplies fixtures. Ask for the plumbing and electrical to be itemised, because those are the numbers that change when a wall is opened. Ask who pulls the permit and whether the price includes it. And ask for the ESA certificate for any electrical and the receipt for any fixtures you did not buy yourself — both are what an insurer or a buyer will want later. The winter is the easiest time to get onto a good crew's schedule for interior work; the spring rush starts in March.

Common questions

Who is the best bathroom renovator in Manotick?

The only one of the three with premises in the village is C. Veh, which also draws its own permit-ready plans — the thing a bathroom that moves plumbing needs first. Gordmay is an owner-run Nepean firm already quoting Manotick bathrooms and carrying tile and structural work in house. Miles is the value call for a same-layout refit, with references on request. For an ensuite that changes the layout, start with C. Veh; for a straight gut-and-replace, get all three to price it.

How much does a bathroom renovation cost in Manotick?

In 2026, a cosmetic refresh with no layout change runs about $7,000 to $15,000; a full gut on the same layout with mid-range finishes $18,000 to $35,000; and a large primary ensuite with custom tile, glass and heated floor $40,000 to $80,000 or more. Manotick quotes sit above Ottawa averages mainly because the rooms are larger and drain changes on a septic lot involve more work.

Do I need a permit to renovate a bathroom in Manotick?

Not for replacing fixtures in place. You need a City of Ottawa building permit as soon as plumbing is extended or moved, a wall is removed or added, or a structural opening changes. On a septic system, adding fixtures or a bedroom can also trigger a review through the Ottawa Septic System Office, which is run by the Rideau Valley Conservation Authority.

Can I add a bathroom on a septic system?

Often, but it depends on how the system was sized. Adding fixture units or a bedroom triggers a review under the Ontario Building Code, and an older or undersized bed may need to be enlarged first. Have the septic assessed before you commit to the renovation budget, not after.

How long does a bathroom renovation take?

A refresh is typically one to two weeks. A full gut is three to five weeks once materials are on site, longer if custom tile or glass is on order. Layout changes that need a permit add two to six weeks of approval time before work starts.

Is a tub-to-shower conversion worth it?

For a secondary bathroom it is the best value change in the list at $4,500 to $11,000, and it is what most buyers now expect in an ensuite. Keep at least one tub in the house for resale, and confirm the new drain location before the quote is final.

Should I fix hard water before renovating a bathroom?

Yes, if you are on a well and do not already have a softener. Iron and scale will mark new glass and fixtures within months. A softener sized for the house is a fraction of the bathroom budget and protects the whole investment.

Call C. Veh Construction &…613-889-3683Comparethree picks